Water
King Plumbing Requirements
Water-King units require between 25 and 50 cm of straight pipe run.
Copper or other metallic pipes are best, but it can be installed
on all types of plastic pipe. It cannot be fitted to lead pipe.
The pipe does not need to be cut, there is no plumbing involved,
nor is there any requirement for an isolating bypass with associated
valves. Insulation may be fitted over the pipes after installation.
Power Requirements
Each unit requires mains voltage supply within one metre of the
unit. The unit should be located within 45 cm of the pipe being
treated.
Evaporative Systems
Where appliances are designed to operate by make up water and
evaporation, such as cooling towers or humidifiers, adequate provision
must be made to clear the build up of any sludgy deposits by regular
“blow down” or other means.